U.S. regulators are adopting large-load tariffs to allocate the financial risk created when utilities build long-lived infrastructure for data centers and other concentrated loads. This paper studies 15 regulator-verified, exact-dated first final tariff decisions covering 13 listed utility parents and 13 states from 2022 through 2026. Customer-specific special-contract approvals are excluded from the primary sample. Expected returns are estimated over trading days [-120,-21]; the primary event window is [-1,+1]. Repeated decisions are collapsed to listed-parent means for exact sign-flip inference. The mean SPY-model cumulative abnormal return is 0.39 percentage points (p = 0.353; bootstrap 95 percent interval: -0.40 to 1.14), providing no evidence of average repricing under the primary model. The XLUadjusted [-1,+1] estimate is positive, but alternative timing windows and influence checks weaken it, making the valuation conclusion benchmark-, window-, and influence-sensitive. A transparent mean-adjusted log-volume measure rises by 0.150 log points, or approximately 16.2 percent. The parent-level result is positive (p = 0.028) but does not survive event-date aggregation (p = 0.110). The log post/pre realized-risk ratio is not distinguishable from zero. The evidence is consistent with, but does not establish, a dependence-sensitive attention response; valuation conclusions are not robust across specifications. The design cannot identify project-level incidence or downstream ratepayer effects.

Author abstract from the research manuscript. Typography and line breaks have been normalized; the linked source may show a different manuscript version.

Keywords

Cite this paper

Yang, F. (2026). Large-Load Tariff Decisions and Utility Market Responses. SSRN. https://papers.ssrn.com/sol3/papers.cfm?abstract_id=7367558

Version & publication history

  1. Original repository record

    Existing SSRN record. Version labels follow the source; no additional version number is inferred.

    View source record ↗
  2. Repository revision

    Revision date recorded in the source catalogue.

  3. Added to GARCH Research Papers

    Bibliographic record added. This is not a new manuscript release or a new DOI.

Access & rights

Source repository access terms apply. Manuscript files remain with the original platform. This catalogue does not redistribute source PDFs.

All rights reserved for manuscript files; see source terms.