Preprint2026

Delivery Deadlines and the Geography of Electricity Costs for Compute

Fuli Yang; Yu Liu; Jianping Huang

Energy & Compute Infrastructure →

Abstract

A longer delivery deadline gives a computing facility more hours in which to run batch jobs, but only if it can allocate power to them in those hours. We price the same completed workload under published Chinese retail electricity tariffs. For the central April workload, we vary the hourly power available to previously released jobs, holding full foresight and the 1.6 MW facility limit fixed. At a 24-hour deadline, Shanghai Shidian has the lower bill below a receiving capacity of about 137 kW; the Pearl River Delta (PRD) has the lower bill above it. Shorter deadlines require more receiving capacity for the ranking to reverse: about 220 kW at eight hours and 364 kW at five hours. With a 100 kW limit, bill-aware online booking captures 67% of the attainable 24-hour savings in PRD and 61% in Shanghai Shidian, relative to optimal dispatch under the same limit. In August, Shanghai Shidian gains more from deferral but remains more expensive. Mengxi has the lowest electricity bill in all 1,200 matched April and August scenarios. The value of deferral at one site and the cost of serving the workload there are distinct: only relative savings can overturn an initial tariff advantage.

Keywords

Cite this paper

Yang, F., Liu, Y., & Huang, J. (2026). Delivery Deadlines and the Geography of Electricity Costs for Compute. GARCH Press Working Paper No. 0137, Version 1. https://doi.org/10.69057/WP-0137-V1

Version & publication history

  1. Original repository record

    Public catalogue record. The manuscript is available to authorized readers.

  2. Added to GARCH Research Papers

    Bibliographic record added. This is not a new manuscript release or a new DOI.

Access & rights

Sign in to preview or download the PDF. Access is available to authorized accounts.